User Tools

Site Tools


policy_documents:code_of_operations:title_04:04_07

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
policy_documents:code_of_operations:title_04:04_07 [2019/12/18 10:58] – created itadminpolicy_documents:code_of_operations:title_04:04_07 [2025/02/26 11:36] (current) president
Line 1: Line 1:
-<WRAP button rightalign> 
-**[[policy_documents:code_of_operations:title_04:title_04|Back to: Title 4: Facilities]]** 
-</WRAP> 
- 
 ==== 4.07 Paint and Member Room Damages Policy ==== ==== 4.07 Paint and Member Room Damages Policy ====
 ---- ----
Line 9: Line 5:
 __**4.07.01**__\\ __**4.07.01**__\\
  
-Any Member who decides to paint their room in any way, will be subject to a House vote to determine whether the room needs to be repainted by that Member at the end of that Member’s tenure, for the sake of attractiveness and viability for future Members a particular room. The House Maintenance Officer will be responsible for bringing this concern before the House at a regularly scheduled House meeting.+Any Member who decides to paint their room in any way may be subject to a House vote to determine whether the room needs to be repainted by that Member at the end of that Member’s tenure, for the sake of attractiveness and viability for future Members of a particular room. The House Maintenance Officer will be responsible for bringing this concern before the House at a regularly scheduled House meeting.
  
-  - **a.** If House decides that a room painted by its current resident should be repainted, that Member shall be responsible for the labor and cost of repainting the room before that Member moves out. +  - **a.** If at least half of the quorum of the House decides that a room painted by its current resident should be repainted, that Member shall be responsible for the labor and cost of repainting the room before that Member moves out. 
-    - **i.** If the room in question is not repainted by that Member within two weeks of the end of that resident’s contract, that Member will be considered non-compliant and $50 will be deducted from their Member Share, to be given to the House for labor and materials. +    - **i.** If the room in question is not repainted by that Member within two weeks of the end of that resident’s contract, that Member will be considered non-compliantand the House may vote a price from the Member’s Share, to be given to the House for labor and materials. 
-    - **ii.** If a House decides that a room be repainted and the current resident does not comply, the House Maintenance Officer will be responsible for ensuring the repainting the room before the new resident moves. This can include, but is not limited to: repainting the room on their own; the temporary use/hiring of SHC salaried staff and preferred SHC subcontractors; and the delegation of work to Member needing to fulfill work holiday hours, etc.+    - **ii.** If a House decides that a room be repainted and the current resident does not comply, the House Maintenance Officer will be responsible for ensuring the repainting of the room before the new resident moves in. This can include, but is not limited to: repainting the room on their own; the temporary use/hiring of SHC salaried staff and preferred SHC subcontractors; and the delegation of work to Members needing to fulfill work holiday hours, etc.
  
-  - **b.** The color of paint used to repaint a resident’s room will be neutral in nature and at the discretion of the House.+  - **b.** The color of paint used to repaint a resident’s room will be neutral in nature and at the discretion of the House. Additionally, any paint colors deemed inappropriate or absurd by the House, such as excessively bright, neon, or highly contrasting colors, should be avoided.
  
 </WRAP> </WRAP>
Line 22: Line 18:
 ---- ----
  
 +~~DISCUSSION~~
 {{tag>[title_04]}} {{tag>[title_04]}}
policy_documents/code_of_operations/title_04/04_07.1576695532.txt.gz · Last modified: 2019/12/18 10:58 by itadmin